CFF MALAYSIA 6th WORK CAMP
DATE: 9th - 20th March 2009
DURATION: 12days

WORK
1.Basic construction of the road which was destroyed due to flood.
@(digs up about 1 meter and hardens it with the stone and concrete).
2.Making fences.


Dug up the soil and hardened it.

Built up fences of 150 meters. It was team work necessary, difficult work though it looked easy.

Work has finished! We toasted with coke.

We love mandi (Malay type bathe in river). It is very comfortable after the work.

Japanese participants: 23pax
Malaysian participants: 2pax
Director: Mr MITSUHIKO ABE
Assistant Director: Mr MAKOTO OOTAWA
Local Assistant Director: Mr NELSON
Work supervisor: Mr FRED
Staff: Ms IRINE & Mr HENRI