Japanese

WORKCAMP REPORTS

10th work camp
9th work camp
2nd working Adult camp
8th work camp
7th work camp
6th work camp
5th work camp
1st working Adult camp
4th work camp
3rd work camp
2nd work camp
1st work camp
The 2nd Working Adults Work Camp Including Handicapped People
DATE: 19th - 23th November 2009
DURATION: 5days

Work camp of "living together and support love" by people of various backgrounds


After getting up, mangosteen picking competition started. In the breakfast, we could eat very fresh them. Sedap!!!

Climbed up on the hill in the jangle together.

Up there, we could see wonderful view, the 1st children house, mangosteen field, and also sea over the mountain slightly.

Our work supervisor Fred explained how to work.

Cooperated each other.

In front of bamboo house, we did make very strong road which car can drive on.
Luckily no rain during the all works

Enjoying mandy ! (Oh, someone's slipper is carried by river water. Please catch it!)

Talking and laughing a lot beyond many barriers.

From the left, Ellen and Tan. We all are going to miss them. But...

We never forget this precious encounter!
See you again. Jumpa lagi!

The second Working Adults Work Camp Including Handicapped People
Total participants 9pax (6 Japanese + 3 Malaysians)
Total Staffs 8pax (5 Malaysians + 2 Japanese + 1 Volunteer)
Director: Mr Mitsuhiko Abe
Assistant director: Mr Takeshi Ishii (CFF Philippine)
Work supervisor: Mr Fred
Cooking staff: Ms Elsie


| HOME | ABOUT US | PROJECTS | WORK CAMP | STUDY TOUR | SUPPORT US | CONTACT |
(C) Caring For the Future Malaysia Berhad.
inserted by FC2 system